Existing in place resilient floor covering and asphaltic adhesives.
Alterna flooring installation guide.
When installing over an existing resilient floor plan the layout so the new tile joints are a minimum of 6 15 2 cm away from the original seams.
Do not install over expansion joints.
They outline important details and special considerations that might not be obvious except to an experienced professional including.
Depending on the type of luxury vinyl floor you ve chosen installation instructions will vary.
The s 288 adhesive must be allowed enough open.
S 288 is applied with the fine notching of the armstrong s 891 trowel.
Read every step of the ones provided with your product.
Make sure to follow the pergo floormate installation instructions taking special care to seal all foam edges with sealing tape and repair all rips and perforations in the underlayment vapor barrier prior to flooring installation.
Find the best rated flooring options see the latest trends and styles from all the top flooring brands and manufacturers.
Subfloor and underlayment requirements preparing trim and establishing a starting point.
Notes for new installations the valves installed in this faucet operate as.
Alterna tile flooring can be installed as a traditional butt fit resilient tile installation using s 288 flooring adhesive.
Whether you need advice on how to repair your floors or are looking to replace an existing floor we ve got you covered.
Page 2 spout putty instruction.
Alterna groutable vinyl tile installation and floor care instructions warning.
Page 1 alterna kitchen sink faucet instructions before you begin kohler co.
Reserves the right to make revisions without notice in the design of faucets as specified in the price book.
The s 288 flooring adhesive must be applied with the recommended trowel notching and allowed enough open time until it becomes dry to touch before installing the tile.
A separate vapor barrier should not be used in conjunction with pergo.
Notching is 1 32 deep 1 16 wide and 5 64 apart.
Flooring installation if desired.
Do not sand dry sweep dry scrape drill saw beadblast or mechanically chip or pulverize existing resilient flooring backing lining felt or asphaltic cut back adhesives.